ADDITIONAL CASE STUDIES
The project is the design and construction of a five storey brick building at Cowleaze Road, KT2, London. It will provide 26 residential units comprising 21 one bedroom affordable pocket units and 5 two bedroom open market Pocket Edition apartments.
READ PDFUnder Permitted Development Rights, this 15 storey commercial building will be converted into 150 residential flats.
READ PDFThe logistically tight site of Gregory House on Libra Road, Plaistow was HG Construction’s second project for Red Door Ventures following the successful delivery of the Tanneries in neighbouring Stratford.
READ PDFThe Hathaway House project is a mixed use new build scheme that will create 79 new luxury residential homes providing a 25% affordable housing contribution as well as 23,000sq ft of commercial / health care space.
READ PDFThis project is for a 4 storey building, comprising of 36 Residential Flats using traditional construction.
READ PDFThe construction of this residential development is on land formally occupied by “The Brewery Tap” public house. The new development comprises the construction of 8 dual aspect apartments.
READ PDFThe project is for the design and construction of 17 dwellings over premises to be occupied by a club and Institute Union.
READ PDFA residential development of 7 flats and 2 town houses on a corner site originally occupied by small businesses but had been derelict for some years prior to re-development.
READ PDFThis project started with the construction of basement car park and service facilities with a super structure covering 100% of site area to form 16 high quality distinct apartments, penthouses and townhouses.
READ PDFThis project is for the design and construction of 37 apartments over ground and a further six floors, 26 of these will be for sale on the private market and 12 shared ownership.
READ PDFThis project was a Housing Association development comprising of 10 no. 3 and 4 bedroom houses, together with tandem double parking for each property.
READ PDFThis project entailed the external refurbishment of a 17-storey tower block to ensure the block has improved thermal efficiency and reduced year on year maintenance costs.
READ PDFThe works comprised the newbuild construction of 29 shared ownership key worker units in a mixed development, utilising both traditional and modern building methods.
READ PDFThis development involved the construction of 9 luxury houses of approximately 5,000 sq.ft each, located in a tree-lined area just off Wimbledon Common.
READ PDFThis project was for the construction of 49 flats in ‘cluster’ formation for the Salvation Army Housing Association, to provide Temporary-to-Permanent accommodation for those in need of a protected environment.
READ PDFWe were contracted to demolish the existing buildings on this site and construct a single block of 10 no. 1, 2, and 3 bedroom flats with basement car parking.
READ PDFThis significant project consisted of the demolition of the existing building and the design and construction of 45 no. 1-bed flats and ancillary accommodation for the Frail and Elderly.
READ PDFConstructed on derelict land, this project was a prime example of an urban development specifically designed to balance the housing need and add to the stock of affordable housing in the area.
READ PDFA contract carried out for Network Housing Association which involved a phased development including the provision of a new print workshop.
READ PDFThis was a Design & Build contract, on a very tight site, completing to a high quality to blend in with the local character whilst maintaining modern facilities and environment.
READ PDFThe Ham at Brentford involved 21 shared ownership flats for Notting Hill Home Ownership, with the contract being taken on as one of a portfolio of projects set back by the demise of Ruddy Construction in 1998.
READ PDFIn West London on the Lisson Green Estate, we have helped to change the physical environment, taking out the old walkways, access tower and empty garages under flats, converting the space into new housing units.
READ PDFThis particular development of 38 flats in Dulwich, in two phases, incorporating the decanting of residents, has been specifically designed to meet the needs of Action for the Blind and is a prime example of a comprehensive design approach.
READ PDFIn a comprehensive conversion and renovation programme we were able to produce 22 flats, many with the features and feel of the original structure, and with sympathetic newly built additions replacing the less successful previously added areas.
READ PDFIn the severest challenge yet to our brownfield reclamation skills we built 36 new houses for East Thames Housing Group and Poplar Harca on an old asphaltic works on the side of Limehouse Cut canal.
READ PDFThe project consisted of demolishing the existing staff accommodation at the rear of the present hostel; new accommodation of 18 bed-sits and 1 staff/carer’s flat; external works and landscaping to the hostel; provision of 6 parking bays.
READ PDFAt Silvertown Urban Village on the former Royal Docks in Newham we have provided 140 new homes for Peabody Trust. This included a landmark £3.6million, 5 storey crescent block.
READ PDFIn November 1995 Hunting Gate (Partnership Developments) Ltd commenced work on the design and construction of 85 dwellings for a consortium of Housing Associations.
READ PDFWe were commissioned to construct these beautifully detailed and finished homes on behalf of Bovis Retirement Homes.
READ PDF